Some 0.5 % of the energy used in the entire Main-Spessart Municipal Region goes to the School- and Sports Center in the town of Lohr am Main, which began operations in 1978 and consists of a college preparatory high school, a middle school, a three-part sports complex, and an indoor swimming pool. Now, through a planned integrated renovation process, the complex’s energy consumption and energy costs are to be substantially reduced. The goals are to create a CO2-neutral energy supply and to approach the »passive house standard«.
For the implementation, three packages of measures will be at the forefront:
Through the exploitation of environmental heat and the absence of combustion processes, the emission of some 2,300 tons of CO2 should be avoided annually. At the same time, optimal teaching and learning conditions, as well as sports opportunities, will be created.
Project Operation:
Schulzentrum Lohr
Zweckverband Schul- und Sportzentrum Lohr a. Main
Nägelseestraße 8
97816 Lohr
Telefon 09352 50042-0
verwaltung@zv-lohr.de
Cooperation Partner:
Architekturbüro Werner Haase, Karlstadt
www.arch-haase-karlstadt.de
Ref. 28279